Arawak Road

A. Current culvert (adj to lot18) is non-functioning causing flooding & erosion - sediment travels dowhhill into FB.                                   B. Unpaved road section eroded (adj. to lots 16,17 & 18)

a. Replace 18 ft culvert w/stone placed at outfall. b. pave one lane, install ditch to direct water flow & install swale across full width of road. 

300

2700

300

1

1

$46,000

High

Caribe Road

Three sections:                                     A. Road (adj to lot 21) steep & adj. to the ghut the section is well vegetated & low traffic.  Low priority for paving at this time.                                                      B. Road (adj to lots I, T, U, & V)  adj to the ghut is flat & shows minimal signs of erosion.  Low priority for paving at this time.                                        C. Road (adj. to lot H) is flat but is down to bedrock.  Paving is best alternative but low priority.  

Pave road & install ditch

600

5400

600

1

$78,720

Low

Cocoloba Trail (east end by Cliffview Rd.

Pavment is being undermined.  Runoff has caused a deep ditch along the edge of the pavement / sediment is going downhill into the Little FB Ghut.

Repair concrete & install ditch

$5000 Quote Received

High

Cocoloba Trail (west side)

Road is steep /erosion continues with some sections of paved lane being undermined

Pave road & install ditch

900

8100

900

$118,080

Medium

Fish Bay Lane East

Road adj to parcel 102, 100 & 108.  Road is down to bedrock in one section but traffic is minimal. Low priority for paving at this time

Pave road & install ditch

Low

Fish Bay Lane West

Road adj to ghut (adj 93, 92, & 91). Area is flat - no traffic, well vegetated - low priority for paving.

Pave road & install ditch

Low

Heron Road

Road (adj to lot R) area flat - low priority for paving. 

Pave road & install ditch

600

5400

600

1

$78,720

Low

Hill Top Road

Road (adj to lots153 & 154) area flat - low priority for paving. 

Pave road & install ditch

650

5850

650

1

$85,280

Low

Marina Drive Bridge over the Battery Ghut

Wing walls eroding

Repair wing walls & add lane

$75,000

High

Marina Drive/Battery Ghut

Water flow during Fall, 2010 rains seriously eroded the bank of the ghut in an area below the bridge which travels along MD. Several sections have either no bank or are very close to undermining MD. 

Reinforce ghut bank

$20,000

High

Marina Drive adj to lots 160 - 167

Runoff from hillside is causing sedimentation to floodplain.

A. Install 18 ft swale across roadway at two sites with stone placed at the outflow area.                                    B. Pave road & install ditch

1300

11,700

1300

2

$179,000

Medium

Marina Drive road sides

Need to protect road side from erosion

Install ditches

700

700

$33,740

Medium

Reef Bay Road

2 Sections:  A. Road (adj to lots118 & 119) has eroded. Runoff from above has caused erosion down to bedrock. Medium priority                           B. Road (adj to lots123 & 124) is flat & erosion is limited. Low priority for paving at this time.

Pave road & install ditch

600

5400

600

1

$78,720

A.Medium  B. Low

Reef Bay Lane East

Road (adj to lots 109 & 111( is well vegetated-no traffic. Low priority for paving at this time.

Pave road & install ditch

Low

Z Road

Right branch of Z Road - small section not paved (adjacent to lot Z-4) erodes during heavy rains

Pave road & install ditch

100

900

100

$10,000

Medium